Products list
Gravel / sand production line capacity need reasonable contr
Now, Gravel / sand production line capacity become a hot topic for customers when they choose the production line. How to effectively control the capacity of gravel / sand production line? Below, we will analyze it according to our years of experience. The petrol station pump system in gravel / sand production line is the main core in all the production line. And the capacity of the production line can directly reflect the working condition. When the production at work, most people will use the lubrication method, and directly use oil pump supply method, but those method can’t directly and efficiently control the capacity which is only rely on the operator’s operation.
 
Although the oil supply system in production line has been improved, the capacity still can not correctly estimate. Therefore, there also will happen kinds of problems during the working time. For those problems, we will analyze them for you. Another side, the oil supply tube in gravel / sand production line is thin and long, and there also has some other impurity mixed in the oil which will easily blocking and cause severe shaking in production line, thus leading to the pipeline broken. In this case, the gravel / sand production line can not be restored to normal working condition. For the oil supply pipeline discharging port in the production line, we will particularly install an impact flow-meter which has two electric contacts. For the two electric contacts, we will set a low limit and an upper limit, so as to achieve reasonable control of the capacity.
INQUIRY

*

*

*

*

*

*

*

Free Live Chat or Leave Message